KC GARAGE CONVERSIONS — QUOTE COMPARISON WORKSHEET Updated September 19, 2026 https://kcgarageconversions.com/guides/compare-garage-conversion-quotes/ Write INCLUDED / ALLOWANCE / EXCLUDED / UNPRICED / NOT APPLICABLE for each bidder. Keep every amount in the same currency and document the source/date. SCOPE BID A BID B BID C Assessment / measurements ______ ______ ______ Design / engineering ______ ______ ______ Permits / inspections ______ ______ ______ Demolition / disposal ______ ______ ______ Hidden damage / shell repairs ______ ______ ______ Structure / footings ______ ______ ______ Slab / moisture / floor assembly ______ ______ ______ Exterior opening infill / drainage ______ ______ ______ Windows / doors / escape openings ______ ______ ______ Insulation / air sealing / separation ______ ______ ______ HVAC / ventilation / sizing ______ ______ ______ Electrical capacity / circuits ______ ______ ______ Plumbing / sewer / water / venting ______ ______ ______ Fixtures / finishes / cabinets ______ ______ ______ Site restoration / access ______ ______ ______ Closeout / documentation / warranties ______ ______ ______ Base bid: Quoted additions needed for equivalent scope: Known excluded owner costs: Unpriced scope (do not treat as zero): Allowances already included in base (do not add them twice): Hypothetical contingency / risk provision and basis: Comparable planning total, if every material amount is supported: Questions: Who verifies unknowns? What triggers a change order? What payment milestones and inspection dependencies apply? What constitutes completion? This worksheet compares scope. It is not a market-price dataset or an estimate.